Figure 33-1:
Cover enclosure screw cap detail
OM-778-3
.PSFPOUIFOFYUQBHFȚ
.BJOUFOBODF7BQPSNJTUTUBOEBSE
XBUFSNPEFMTDPOUJOVFE
Humidifier De-scaling Solution
Scale buildup on humidifier heaters acts
as an insulator, reducing humidifier
performance while increasing energy
costs. To keep humidifiers operating as
efficiently as possible, remove scale with
DRI-STEEM's Humidifier De-scaling Solution,
available for purchase from your DRI-STEEM
representative or distributor.
The De-scaling Solution cleans without risk
of corroding humidifier tanks or welds;
and there is no off-gassing, flammability,
or added heat risks associated with other
cleaning solutions. The De-scaling Solution
also cleans surfaces unreachable by hand
scraping.
DRI-STEEM's Humidifier De-scaling Solution
is the only approved cleaner/de-scaler for
use with DRI-STEEM humidifiers. Use of
other cleaners/de-scalers may void your
DRI-STEEM warranty.
mc_021908_1410
Cool down humidifier before beginning maintenance
Before performing any maintenance, allow the tank to cool down.
Note: Fresh make-up water is used to speed up cooling. Do not
close the manual water supply before cooling down the
humidifier; otherwise the tank could stay hot for several
hours.
t *OTVMBUFEBOEVOJOTVMBUFEUBOLTXJMMIBWFIPUTVSGBDFT
t 7FSJGZUIBUUIFSFJTOPDBMMGPSIVNJEJUZBOEUIBUUIFBRVBTUBUTFU
point (adjusted using the keypad/display Setup screens) is less
than room temperature (default setting is 40 °F [4 °C]) so that the
heaters do not energize while cooling down the tank.
t 'PSNPEFMTXJUIBTUBOEBSEESBJOWBMWF
Manually open the drain valve by moving the valve lever
located on the back of the drain valve to the manual open
position.
The fill valve eventually opens.
Let the fill water run until the tank is cooled; then shut off the
field-installed manual supply water shut-off valve.
Let the tank drain; then manually close the drain valve.
t 'PSNPEFMTXJUIPQUJPOBMESBJOWBMWFT
For drain valves without the manual open lever, use the keypad
to perform the cool down process.
Go to the control modes screen and select Manual Drain.
Allow approximately half the water to drain out of the tank.
In the Control Modes screen select Auto; the fill valve opens
and the humidifier cools down.
When the fill valve closes, select Manual Drain in the Control
Modes screen and let the tank drain dry. The humidifier should
be cool enough to work on.
For more information about using the keypad, see the
Vapor-logic
3 Installation and Operation Manual.
mc_052708_1145
Inspection and maintenance
"OOVBMMZ (also recommended when maintenance is performed)
 t *OTQFDUUBOLBOEHBTLFUTGPSMFBLT
 t .FBTVSFDVSSFOUESBXPGIFBUFSTBOEWFSJGZBNQWBMVFTQFS
stage by comparing to the wiring diagram located inside the
subpanel cover. This identifies any burned out heaters. Only
qualified electrical personnel should perform this task.
 t "MMTBGFUZEFWJDFTJOUIFDPOUSPMDJSDVJUTIPVMECFDZDMFEPO
and off to verify they are functioning. These include:
High limit switch
Airflow proving switch
Low water level probe. Pull out probe plug; fill valve should
energize.