Installation and Operation Manual
☐ Check the flush duration (default is 1 minute).
☐
Check the RH set point and set at the desired level.
☐
Confirm that the control input signal is consistent with the
Vapor-logic
3
configuration string. Identify the factory-set
Vapor-logic
3
configuration string on the wiring diagram or on
the outside of the control cabinet door. Refer to the configuration
string descriptions on Pages 32 and 33.
☐
Confirm that all wiring is correct per the wiring diagram.
☐
Confirm that proper grounding and an approved earth ground
are provided.
☐
Confirm that the analog inputs are configured properly by
verifying that J14/J17, J15/J18, and J16/J19 shunt connectors
on the Vapor-logic
3
board are in their correct position per the
wiring diagram. See Pages 11 and 13 for the physical locations.
☐
Confirm that the keypad/display is mounted with modular cable
routed away from high voltage circuits and connected to the J2
female connector on the Vapor-logic
3
board.
☐
Turn water supply on and confirm that the drain valve is closed.
☐
Turn power on and confirm that the display shows the Main
Menu screen with an operational clock.
☐
Enter the Control Modes screen and make sure the system is in
auto mode.
☐
When “Filling” appears on the status line of the Idle screen,
confirm that the tank is filling with water.
☐
Confirm that the airflow switch is closed.